Pipes and cables everywhere! 

OK week 10, it’s been a busy house this week with different trades in and my builders also. I’m starting to struggle with a full house, the mess and dirt everywhere! But I’m keeping my cool and pushing through with a smile!!! 

The ceiling all got taken down this week, we’re lowing the ceiling a bit as we have higher than normal ceilings so if we bring it down a bit then we can hide this steel and have a totally flat ceiling which will look so much nicer. 

A room under refurbishment for a house extension with exposed wooden ceiling beams, pipes, and cables running along unfinished walls. Building materials and tools are scattered about, with a white boiler mounted on the wall.

The electrician was in, getting all the electrics put in place so the builders then can start plasterboarding over it all and hidden under the floor and ceilings. This is the part you need to know where everything is going so you can plan the electrics. They will ask you where you want everything, sockets, lights, switches. So make sure you have a plan of where your furniture is going! 

An unfinished room for a house extension features a partially built brick wall, exposed cables and wiring, and a window on the left. Electrical sockets and metal strips are visible, with construction materials scattered on the floor and window sill.

Insulation going in everywhere so it can get warmer in here. It’s going to be the warmest part of the house as there’s insulation everywhere!! 

A room under construction for a house extension with exposed brickwork, wooden studs, visible cables and pipes, partially insulated ceiling panels, scaffolding, a drill, and a toolbag. Natural light enters through a window on the left.

Lots and lots of plasterboard arriving! I can’t wait to all of this is up on the walls as it means we’re so much closer to finished! 

Two workers unload building materials, including pipes and cables, from a Travis Perkins lorry using a crane, with a large pile of construction rubble in the foreground on a residential street where a house extension is underway.

Someone stole the front door……

A view from inside a house undergoing renovation, showing exposed brick walls, building materials, cables, and tools. An open door leads outside where a van and more building supplies for the house extension are visible.

and put it on the front of the house! We’re keeping the same front door but just moving it forward, it looks so nice on the front now. Even the neighbours commented how nice it looks on the new part now. I think it’s just because they got so used to the ugly site door on the front!! 

A man in a blue shirt stands in a partially renovated entrance with his arms stretched wide. Exposed brick walls and visible pipes add to the work-in-progress feel, while coats, bags, and a shelving unit are arranged on the right. A partially finished brick house entrance with a temporary wooden door, building materials and pipes piled nearby, and tools leaning against the wall. The area is unfinished, with exposed timber, loose bricks, and visible cables throughout the house extension. A brick house with a black front door, frosted glass panels, and three white-framed windows. Visible pipes run along the side near a green wheelie bin, while a “Rosewood Glazing” sign sits by the entrance and a light glows inside.

The electricians use a chaser tool to cut out the gaps for the wires quickly and neatly. Look how neat that straight line is! 

A grey wall with exposed wiring, pipes, and metal brackets; a vertical groove shows electrical cables and a partially patched area, revealing ongoing house extension work or repairs.

I also learnt all about a ‘water table’ which is what this puddle is! Apparently, that’s basically sea level but it’s just very close to our floor under our house!! It rises up and down with how much rain we’ve had. 

Exposed floorboards in a house extension reveal an array of pipes, cables, and debris beneath, with some pipes labelled and a dark patch of water visible on the ground below.

It’s great to see rooms coming together with the plasterboarding

Then the plumber came for 2 days and got lots and lots of pipework in! There is so much of it under the floor that we won’t ever see again. Let’s hope it all works ok when they run water through them!!!

The bonus of having a build like this and your house being pulled apart is being able to add extras like an outside tap to your house easily. As we don’t have side access anymore this will be useful to have outside the front for washing the car, watering plants etc 

This was taken on a sunny morning when the light was flooding the utility room through the sun tunnel. We’ve been worried that it wasn’t enough coming in, but once the sun shines it’s brilliant. 

We’re on week 11 now and the rush is on to get it ready for my kitchen to be fitted on 25th November! Will it be ready??!

Vlog Update 

Head over to my Instagram or Facebook where you can follow daily updates and stories to see behind the scenes each week. I’m really enjoying sharing this build and I hope it gives you an idea on what goes on when building an extension if your ever thinking of having one yourself. 

 

18 Comments

  1. Wow you’re really in full swing with the works now, it looks as though it’s progressing well.

  2. Melanie williams Reply

    How fab, it is really coming along for sure. Looks like you are nearly there x

  3. It is certainly all coming along! So much has to be done before all of the finishing touches but watching the progress is fantastic to see.

    • SOoooo much stuff before the finishing bits, the weird thing is I have to think about all those finishing touches when it all looks a mess!!

  4. It is mind-blowing really, just how much goes in to an extension. Or any renovations really.

    I am glad to see you’re still remaining cool, calm and collected… if not a little messy!

    • hhhhhmmmmmmm……I’m trying to!! I have enjoyed seeing each and every stage, I will appreciate the effort behind it to get it to each stage now

  5. Gosh Steph I can’t believe how much it’s all been coming on since I read your last update. You must be absolutely thrilled with the progress and nice that the plasterboard is coming into effect now.

    • Thank you, it’s amazing how quickly it does come together, but I’m ready for it to be finished now!!

  6. Sarah Howe Reply

    Ooh I bet it was exciting when the Plumber came to get the pipes in for water. Makes it that bit closer for living in! It’s getting there week by week.

    • Getting closer and closer! Every new bit is now one step closer to getting my house back!!

  7. MELANIE EDJOURIAN Reply

    Make sure they put plenty of that insulation in everywhere, it’s freezing now!!! The ceiling should be great when done. Lucky they were high to start with.

Write A Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.